Scale changes everything in Burr Ridge. These are the biggest home footprints in our service area, and the basements below them are large enough that a remodel becomes a whole-floor renovation, theater, bar, wine storage, gym, and golf simulator, planned together rather than bolted on one at a time. When a lower level this size was finished fifteen or twenty years ago, updating it piecemeal wastes the opportunity. We redesign the entire floor as one composition, then rebuild it with drywall ceilings, coordinated lighting, and finishes that hold up across thousands of square feet.
Golf simulators deserve a special mention, because demand for them is stronger in Burr Ridge than anywhere else we build. Retrofitting one into an existing finished basement means verifying ceiling height, engineering the bay's dimensions, and integrating it with the theater and bar so the floor flows. The project begins with a free in-home design consultation and a fully itemized quote, we handle all permits, and our licensed and insured crews complete most whole-floor remodels in 6 to 10 weeks. Financing is available on larger projects. Call (815) 217-9050.
It starts with a free in-home design consultation. We measure your basement, check moisture and mechanicals, and talk through how you want the space to live. You get a design and an itemized quote, we handle permits and inspections, and one team runs the build from the first cut to the final walkthrough. Most projects take 6 to 10 weeks of construction.
Usually, if the numbers work. A proper bay needs generous ceiling height plus adequate depth and width for a full swing, and we measure all three before promising anything. Burr Ridge basements clear those requirements more often than any town we serve. The simulator then gets designed into the floor plan, not squeezed in.
At this scale, all at once usually wins. A single mobilization means one demo, one permit cycle, consistent finishes across the floor, and rooms that are designed to work together, theater sound isolated from the bar, gym ventilation planned, sightlines intentional. Phasing is possible, but it costs more per square foot over time.
Most run 6 to 10 weeks, with the largest multi-room floors at the top of that range. Specialty items like simulator equipment or theater components can have their own lead times, so we order them early in the schedule. Your itemized quote includes a stage-by-stage timeline before work begins.
Tell us about your basement and we will follow up within one business day to set up an in-home visit.